24
Aug

Inspecting the module

Written by admin. Posted in Battery Pack

We had something to inspect with this module. Here is how we get access:

24
Jun

All links are connected

Written by admin. Posted in Battery Pack

All links are connected and the BMS slave boards are going in:

Notice that there are no longer exposed conductors. We added FR4 in strategic forms that simply pull out for access to the high current module interconnect jumpers.

06
Apr

The pack installed

Written by admin. Posted in Battery Pack

The modules are all connected except for the column of links just left of center. They will be rotated 180 deg and cinched down to complete the circuit when ready to apply power.

01
Jan

Removal / installation

Written by admin. Posted in Battery Pack

Here is the process of removal/Installation

24
Oct

What will replace cardboard box

Written by admin. Posted in Battery Pack

No longer a cardboard box:

Contact us

Phone: (619) 438-0018

EMAIL US