24
Jul

Close look at the box where modules will go

Written by admin. Posted in Battery Pack

Here is basic form of the structure that will hold the modules:

Its a tight fit but has the needed clearances around all 6 surfaces. 

Here is the box, face down on the bench with all modules slid into place.

The BMS boards will be plugged in last, at the time of power up so the modules are not fragile during handling. For high reliability, all contacts in this system are gold on gold.

Other than the high current conductors, there will be only one cable entering this box, the communication cable, which is optically isolated from the cells.

Contact us

Phone: (619) 438-0018

EMAIL US